Manufactured, delivered, installed and commissioned equipment for Drum Screens at the Sewage Treatment Plant:
- Palm Jumeirah STP SU2
Dubai, United Arab Emirates
Subject of the manufacturing, delivery, installation and commissioning were:
- 3 pcs traveling device for high-pressure cleaning system of drum screens
- 1 pc 130bar high-pressure pump
- 1 pc control panel
- Supply and installation of power and control cables and high-pressure pipes
- Testing and commissioning of the system
Above mentioned delivery, installation and commissioning took place in April 2018.